记得3年前,我毕业后就离开老乡槟城只身来到新加坡这个地方赚取新币。作为一个土木工程师,我人生第一个project就是C901DTL Marina Bay station and tunnels。我负责的地方是一段大约150m 的隧道。这地铁站以后将是连接新加坡两大综合娱乐城之一的Marina Sands的其中一个链接地铁站。

昨天是C901 Marina Bay地铁站 TOP的日子,我的公司特地安排了一次site visit。还记得3年前我和我的伙伴们日以继夜24小时的为这场project赶工,那时得我们感到十分辛苦和压力。但是,今天看到这美丽的MRT 地铁站和tunnel时觉得当时的辛苦是值得的。




在这里就让我大略介绍这Marina Bay地铁站的施工过程吧。。。
  • Retaining wall: 
    • Diaphragm Wall, Sheet Pile Wall, Continuous Bored Pile Wall,Soldier Pile Wall
Sheet Pile & Soldier Pile
BC Cutter for diaphragm wall
Silent Piler for sheet pile wall
Bentonite test - Viscosity test

  • Soil improvement:
    • Jet Grout Pile, Deep Soil Mix, Chemical Grouting 
JGP
DSM/GMP
Coring test
Compaction test
  • Bored Pile, Barrette Pile
Bored Pile
 Load Test Pile
PIT
PDA
  • Strutting and Excavation layer by layer 
    Strutting work by layer
    Waler Installation
    Concrete packing
    Fitter installing strut
    MPI test
    UT
    Preload
    Excavation by layer using mini excavator
    Remove the soil using grab

    • Hacking Pile Head
    Manual hacking
    Bored pile before hack

    Mechanical hacking
    • Water Proofing 
    Membrane
    Liquid membrane
    Membrane and poliform
    Poliform
      Preprufe cover entire beam
      • Structure Work 

      Pull out test

      Coupler

      Drilling for input starter bar
      Structure work
      Steel formwork

      free-style welding

      Track before casting

      Track after casting(box out for railing)
        • Backfileding 


           Nuclear density test
          Soil replacement test
          • M&E and architecture work
          Before
          After
          Before
          After
          Before
          After
          Before
          After
          • Completion of Marina Bay station









          参观完这个MRT站的确让我感到有一点小小的成就感。以后和大家经过Marina Bay地铁站和tunnel时,我还可以自豪的跟大家说:“这隧道的所有地方可还留着我的脚印哦!”
          My lovely senior
          做工最开心的还是大家聚在一起吃喝