昨天是C901 Marina Bay地铁站 TOP的日子,我的公司特地安排了一次site visit。还记得3年前我和我的伙伴们日以继夜24小时的为这场project赶工,那时得我们感到十分辛苦和压力。但是,今天看到这美丽的MRT 地铁站和tunnel时觉得当时的辛苦是值得的。
在这里就让我大略介绍这Marina Bay地铁站的施工过程吧。。。
- Retaining wall:
- Diaphragm Wall, Sheet Pile Wall, Continuous Bored Pile Wall,Soldier Pile Wall
Sheet Pile & Soldier Pile |
BC Cutter for diaphragm wall |
Silent Piler for sheet pile wall |
Bentonite test - Viscosity test |
- Soil improvement:
- Jet Grout Pile, Deep Soil Mix, Chemical Grouting
JGP |
DSM/GMP |
Coring test |
Compaction test |
- Bored Pile, Barrette Pile
Bored Pile |
Load Test Pile |
PIT |
PDA |
- Strutting and Excavation layer by layer
Strutting work by layer |
Waler Installation |
Concrete packing |
Fitter installing strut |
MPI test |
UT |
Preload |
Excavation by layer using mini excavator |
Remove the soil using grab |
- Hacking Pile Head
Manual hacking |
Bored pile before hack |
Mechanical hacking |
- Water Proofing
Membrane |
Liquid membrane |
Membrane and poliform |
Poliform |
Preprufe cover entire beam |
- Structure Work
Pull out test |
Coupler |
Drilling for input starter bar |
Structure work |
Steel formwork |
free-style welding |
Track before casting |
Track after casting(box out for railing) |
- Backfileding
Nuclear density test |
Soil replacement test |
- M&E and architecture work
Before |
After |
Before |
After |
Before |
After |
Before |
After |
- Completion of Marina Bay station
参观完这个MRT站的确让我感到有一点小小的成就感。以后和大家经过Marina Bay地铁站和tunnel时,我还可以自豪的跟大家说:“这隧道的所有地方可还留着我的脚印哦!”
My lovely senior |
做工最开心的还是大家聚在一起吃喝 |
No comments:
Post a Comment