昨天是C901 Marina Bay地铁站 TOP的日子,我的公司特地安排了一次site visit。还记得3年前我和我的伙伴们日以继夜24小时的为这场project赶工,那时得我们感到十分辛苦和压力。但是,今天看到这美丽的MRT 地铁站和tunnel时觉得当时的辛苦是值得的。
在这里就让我大略介绍这Marina Bay地铁站的施工过程吧。。。
- Retaining wall:
- Diaphragm Wall, Sheet Pile Wall, Continuous Bored Pile Wall,Soldier Pile Wall
| Sheet Pile & Soldier Pile |
| BC Cutter for diaphragm wall |
| Silent Piler for sheet pile wall |
| Bentonite test - Viscosity test |
- Soil improvement:
- Jet Grout Pile, Deep Soil Mix, Chemical Grouting
| JGP |
| DSM/GMP |
| Coring test |
| Compaction test |
- Bored Pile, Barrette Pile
| Bored Pile |
| Load Test Pile |
| PIT |
| PDA |
- Strutting and Excavation layer by layer
| Strutting work by layer |
| Waler Installation |
| Concrete packing |
| Fitter installing strut |
| MPI test |
| UT |
| Preload |
| Excavation by layer using mini excavator |
| Remove the soil using grab |
- Hacking Pile Head
| Manual hacking |
| Bored pile before hack |
| Mechanical hacking |
- Water Proofing
| Membrane |
| Liquid membrane |
| Membrane and poliform |
| Poliform |
| Preprufe cover entire beam |
- Structure Work
| Pull out test |
| Coupler |
| Drilling for input starter bar |
| Structure work |
| Steel formwork |
| free-style welding |
| Track before casting |
| Track after casting(box out for railing) |
- Backfileding
| Nuclear density test |
| Soil replacement test |
- M&E and architecture work
| Before |
| After |
| Before |
| After |
| Before |
| After |
| Before |
| After |
- Completion of Marina Bay station
参观完这个MRT站的确让我感到有一点小小的成就感。以后和大家经过Marina Bay地铁站和tunnel时,我还可以自豪的跟大家说:“这隧道的所有地方可还留着我的脚印哦!”